Menu

banner

Wilfried Kus

Areas of Specialisation:
Vertical pumps, submersible pumps and other special constructions


Tel: +49 (0234) 893 570 26

Spoken Languages: 
Germany flag

Position at Aurum Group:

Engineering and order processing

Professional Experience:

Worked in the design-engineering department as an engineering draftsman
Worked in the design-engineering department as a certified mechanical technician
In the mid 1980s began the changeover from drawing boards to 2D CAD.
2012 began the implementation in the mixed use of the 2D and 3D CAD-systems

Employment Background:

More than 42 years of the uninterrupted work with the Habermann company in the design-engineering department.

Area of Responsibility & Key Projects:

  • Project Metro Lyon, train tunnel of the grande vitesse, France.
  • Mobile pumps V330 for Bayer AG.
  • All V2 and V300 projects for steelmaker Badische Stahlwerke (BSW).
  • Submersible pumps of the Techno-Assarel.
  • Pumps V2 for Italimpianti.
  • Fitting of German power plants with the flue gas desulphurization units.
  • GFA projects (Company dealing with processing machines).
  • Elbe tunnel project.
  • Lurgi projects such as the one in Cayeli, Turkey.
  • Thyssen Duisburg hot rolling mills.
  • Rheinkalk and many other projects.

In new construction the creation of 3D models with all necessary graphic derivations.
In the projects: graphical processing of new or changed design, preparing of all necessary documents for production and customer’s documentation, technical assistance for questions relating to production.